Order to Installation
Planning Guidelines and Permission
Local Authorities require that certain building works meet standards during construction. We have a good understanding of what needs to be done and at what point the authorities need to be involved should inspections be required.
Most of the projects we deliver don’t require planning permission, but if they do we make sure planning issues are dealt with appropriately.
Survey
A site survey is usually required to ensure we:
- have the correct measurements for the products we provide
- the site is suitable for the installation
- identify additional work that may be required
- identify hazards that may impact the installation
Preparation
Tasks before we do the installation such as groundwork, other building reparations
Delivery
When you place your order with us, the surveys are then completed. We ensure the specified products are delivered ready for installation.
Installation
After all the preparation and legal requirements, the installation may take from one day to weeks depending on the project.
Please call or email